Documentation Index
Fetch the complete documentation index at: https://docs.auditynow.com/llms.txt
Use this file to discover all available pages before exploring further.
What this is
This page documents the constraints that apply to AI analysis operations across the audit lifecycle: timeouts, credit costs, per-plan limits, and strategies to stay within them. Consulting teams running large or complex engagements should review this page before triggering analysis on data-heavy projects.Before you start
- Review your current credit balance under your workspace avatar → Account → Credits before starting any analysis-intensive step.
- Understand which steps consume credits: web intelligence, document analysis, full AI analysis, memo generation, report generation, and ROI calculation all cost credits. Discovery questionnaire and client profile do not.
Analysis timeout: 180 seconds
Every AI analysis job has a hard timeout of 180 seconds. If the synthesis does not complete within that window, the job is marked as timed out and no findings are written. What causes timeouts:- A very large number of documents (especially large PDFs).
- Long interview transcripts (multiple transcripts each >5,000 words).
- Running analysis with all input types simultaneously on a large project.
- Keep individual document size under 10 MB and total document count within plan limits.
- Split long transcripts across multiple interview records (see Interviews).
- If you have a very large evidence corpus, run analysis in phases: first with documents and discovery, review findings, then add interviews and re-run.
Credit consumption by step
| Step | Credit cost |
|---|---|
| Web intelligence | 50 credits per run |
| Document analysis | ~5 credits per document (varies by size) |
| Full AI analysis | ~20–50 credits per run (varies by input volume) |
| Memo generation | ~10 credits per memo type |
| Final report generation | ~30–60 credits per generation |
| Section regeneration | ~5 credits per section |
| ROI calculations | No additional cost |
| Gamma deck generation | ~15 credits per deck |
Credit costs shown are estimates. The actual cost is displayed in the confirmation dialog before you trigger each operation. Costs may vary as the model pipeline is updated.
Per-plan limits
| Limit | Solo | Team | Enterprise |
|---|---|---|---|
| Documents per project | 10 | 25 | Unlimited |
| Interview records per project | 5 | 20 | Unlimited |
| Opportunities on matrix | 5 | 20 | Unlimited |
| Memo types per project | 2 | All | All |
| Report versions | 1 | 10 | Unlimited |
| Concurrent analysis jobs | 1 | 3 | Unlimited |
| Web intelligence runs per project | Unlimited | Unlimited | Unlimited |
| Bundle export | No | Yes | Yes |
What happens when a job times out
- The job is marked Timed out in the project dashboard.
- No partial findings are written (analysis is atomic, it either completes or does not).
- Credits for timed-out jobs are not automatically refunded. Contact support@auditynow.com if a job timed out due to a platform issue rather than input size.

